Devtech 3 Phase Coupler
Send a free RFQ and get the supplier's best price.
Trade with confidence on Abraa
طريقة دفعة آمنة وموثوقة باستخدام منصة عبرة للدفع عبر الانترنت
Supplier verification not completed
Pay only through Abraa to stay protected. Never pay a supplier by direct transfer.
Secure Payment
Pay through Abraa, never by direct transfer to a supplier.
Product Inspection
Book a check before shipping to confirm quality and quantity.
حماية المشتري
Get support and refunds if goods arrive not as described.
Verified Suppliers
Licence, address and on-site checks by the Abraa team.
مواصفات المنتج
| الحالة | New |
| الكفالة | YES |
مواصفات المنتج
Devtech 3 Phase Coupler is specifically designed for the Gateway products (IoT 5101/5104) which uses power line communication (PLC) mesh technology. It is used for coupling AC mains with PLC data lines (PLT + and PLT -). This can also be used for connecting AC mains signals between mutually different 3 phases (R, Y, B) in the PLC environment and especially optimized to be used in the LonWorks® power line communication. It is an important infrastructure component intended to use for all commercial PLC network applications especially for Street light management systems.
Features:
- Acts as a bridge between AC Mains and PLC Data lines ( PLT + and PLT -).
- Attenuates large AC Mains signals ( 50 ~ 60Hz) while passing high frequency PLC communication signals.
- Galvanic safety isolation between AC Mains and PLT+ & – terminals
- Supports Line-to- Neutral Coupling.
Technical Data
| Line Voltage (P-N) | AC 110 ~ 305V |
| Line Frequency | 50 ~ 60Hz |
| Ambient Temperature (ta) | -40 to +55°C |
| PLC Operating Frequency | CENELEC C Band (110kHz ~ 140kHz) CENELEC A Band (60kHz ~ 90kHz) |
Installation Instructions
- Installation must only be performed by a qualified electrician.
- Turn off the power at the main breaker panel.
- Be sure that all power has been disconnected by turning off the main breaker panel then Connect only copper or copper clad wire to this device.
- If required, install a circuit breaker in the breaker panel according to current rating according to the load.
- After all connections have been made, be certain that all wire connectors are firmly attached and there is no exposed copper.
- Install 3 Phase Powerline communication Coupler into panel box.
- Retain these instructions for reference.
\